4.5 MW Crop Residues fired Power
Plant in Kirugaval
|
 |
 |
33,661 MT of Cane Trash & Coconut Fronds
collected during FY 2003-04 (73% of total fuel fired). |
 |
MPPL's Biomass Supply Chain has created 450
jobs and contributes Rs.45 million/year to rural GDP. |
 |
Boiler availability is an area of key
concern while firing low density Crop residues in view of the problem of
slagging/corrosion, particularly in the super heater zone. There
is also the issue of higher unburnts particularly when fuel moisture
content is high. |
 |
During FY 2003-04 improvements in the Boiler
Construction as well as O&M protocols have been implemented, which
has resulted in Boiler availability of 87.71% and efficiency of
76.54%. |
|
|
|
|
|
|
|
|
|
 |
During FY 2003-04
the Key Performance Parameters were
-
Plant Availability of 81.41% and PLF of
75.64%.
-
Auxiliary
Power Consumption of 11.50%.
-
Specific fuel
consumption of 1.55 Kg/kwh with average fuel calorific value of 2,700
kcal/kg & cost of Rs.1051/MT.
|
 |
Electricity Sales |
|
: 26.54 million kwh |
 |
Gross
Income |
|
: Rs.93.69 million |
 |
Earnings
Before Depreciation Interest & Tax (EBDIT) |
|
: Rs.28.62 million (30%) |
|
 |
|
|