MPPL Renewable Energy

News


 

            MPPL's Modular Biomass Power Plants

MPPL's 4.5 MW (Rankine Cyce) Biomass Power Plant

 

 

33,661 MT of Cane Trash & Coconut Fronds fired...73% of total fuel fired

 

Boiler availability of 87.71% and efficiency of 76.54% have been established

Key Performance arameters (2003-04)

  • Plant Availability of 81.41% and PLF of 75.64%

  • Auxiliary Power Consumption of 11.50%Ž11.0%

  • Specific fuel consumption of 1.55 Kg/kwh with average fuel calorific value of 2,700 kcal/kg & cost of Rs.1051/MT.

Electricity Sales : 26.54 million kwh

World's 1st Gold Standard CDM Project

 

 

6.7 MW Biomass Power Plants (18 in Punjab)

Plant Electrical Efficiency

8 MW Plant Layout

10 MW Plant Layout

5 MW Heat Mass Balance Diagram

3 MW Heat Mass Balance Diagram

Organic Fertilizer from Biomass P.P. Waste

Biomass + Compost Yard

Home                                                                                                                                                                                        Top

Links

Gold Standard Local Stakeholder Consultation Report for the project “Grid connected biogas based power project in Punjab” held on 10th July 2009 in Binjon and 11th September 2009 in Deepshing Wala village

Gold Standard Local Stakeholder Consultation Report for the project “Biomass based power project in Punjab” held on 27th Jan 2009 in Binjon and 11th September 2009 in Deepshing Wala village

 Please send your comments on the above reports to marketing@mpppl.com