MPPL's Modular Biomass Power Plants
MPPL's 4.5 MW (Rankine Cyce) Biomass Power Plant
33,661 MT of Cane Trash & Coconut Fronds fired...73% of total fuel fired
Boiler availability of 87.71% and efficiency of 76.54% have been established
Key Performance arameters (2003-04)
Plant Availability of 81.41% and PLF of 75.64%
Auxiliary Power Consumption of 11.50%Ž11.0%
Specific fuel consumption of 1.55 Kg/kwh with average fuel calorific value of 2,700 kcal/kg & cost of Rs.1051/MT.
Electricity Sales : 26.54 million kwh
World's 1st Gold Standard CDM Project
6.7 MW Biomass Power Plants (18 in Punjab)
Plant Electrical Efficiency
8 MW Plant Layout
10 MW Plant Layout
5 MW Heat Mass Balance Diagram
3 MW Heat Mass Balance Diagram
Organic Fertilizer from Biomass P.P. Waste
Biomass + Compost Yard
Home Top
Links
Gold Standard Local Stakeholder Consultation Report for the project “Grid connected biogas based power project in Punjab” held on 10th July 2009 in Binjon and 11th September 2009 in Deepshing Wala village
Gold Standard Local Stakeholder Consultation Report for the project “Biomass based power project in Punjab” held on 27th Jan 2009 in Binjon and 11th September 2009 in Deepshing Wala village
Please send your comments on the above reports to marketing@mpppl.com